Our current project is a full re-fit on a 68' narrow boat. She had been lifted out and gutted before being brought to our workshop. It was originally a live aboard but is being altered into an eight berth holiday boat. She is to be finished in pine boards and trims.

Boat lifted on trailer

The boat is lifted from where it has been stored onto the back of one of A B Tuckey's trailers ready for being transported to our workshop.

inside empty hull

The empty boat with its original spray foam, which has been pressure washed with several chemicals to ensure it is clean.

ready for floor

New timber battens are bolted to floor ribs before 18mm plywood is screwed down to create the sub floor.

panels fitted

The roof lining panels have been fitted and the side panel are nearly done.

new door

A new door and frame is made and fitted, Cover strips are glued around the panels and to cover joints in plywood. The panels are then coated with 3 coats of Danish Oil.

galley picture

The galley units are made and appliances fitted. The tile floor has also been laid throughout the boat.

Porthole in corridor

A porthole liner has been turned and fitted on the side of the boat.

sanded boat

The outside is sanded down in preperation for the painting.

painted boat

Oxford blue finish is applied, 5 coats in total of primer, undercoat and gloss. The lines and signage still need to be applied.

view of galley

View from the seating area of the galley and passage to bedrooms and toilets

seating open and closed

Seating area which converts into a double bed, scroll over to see it in bed position

 

 

More pictures will be added so please check back soon for updates

Click here to email us

You can call us on any of the numbers below

01455 459 321 office / fax / answer phone - Mobile: 07973 618 875 - Skype Logo: 0121 288 2803